Pitfalls of Relying on Manual Approvals in CI/CD
Why manual CI/CD approvals slow delivery without reducing failures, what DORA research says, and the automated controls and focused gates to use instead.
Manual approvals in CI/CD feel safe, but they usually slow delivery without making releases safer. They create queues, push teams toward large risky batches, invite rubber-stamp clicks, and hide the real controls. DORA's research found no evidence that formal external review lowers failure rates. Keep human approval for a few high-risk decisions and automate the rest.
This post looks at what goes wrong when a pipeline leans on people clicking "approve", how to tell whether your approvals are doing any work, and what to replace them with. Research findings come from DORA's capability guide on change approval, and tool details from the GitHub and Jenkins documentation, checked in November 2026.
Key takeaways
- DORA reports that heavyweight external approvals have a negative impact on software delivery performance, and it found no evidence that more formal review reduces failures.
- Approval queues make changes wait, which grows batch size, which raises the risk of each release. The safety step ends up increasing risk.
- Approvers far from the code often cannot judge the change, so approval turns into a habit rather than a check.
- Peer review recorded in the development platform can meet segregation-of-duties goals with far less delay.
- Automated checks (tests, security scans, policy as code, progressive delivery with automatic rollback) catch more problems, faster, and consistently.
- Where a human gate stays, make it specific: who approves, what they check, how long it can wait, and what evidence they see.
Why teams add manual approvals
Approvals rarely appear out of nowhere. They are usually a reaction: an outage after a bad deployment, an audit finding about who can change production, or a new compliance requirement. Adding a person who must click "approve" before production feels like a reasonable, visible fix. Tools make it easy too. GitHub Actions environments let you require up to six reviewers before a job proceeds, and a Jenkins pipeline can pause on an input step until someone clicks the proceed button.
The intent is fine. Someone wants assurance that a change is correct, that it is authorized, and that the right people know it is happening. The trouble starts when a manual click becomes the main way of getting that assurance, applied to every change in the same way.
Pitfall 1: queues that make releases bigger and riskier
Every approval step adds waiting time. The approver is in a meeting, in another time zone, or approving a dozen other changes. While a change waits, more changes pile up behind it, and when the gate finally opens, they go out together.
DORA's guide describes this chain directly: heavy approval processes slow delivery, which leads to larger, less frequent releases, and those carry more risk and higher change fail rates. A deployment with forty changes is harder to test, harder to diagnose when it fails, and harder to roll back than forty small deployments. The approval was meant to reduce risk, and the batching it caused increased it.
You can see this in your own numbers. If change lead time is long and most of it is spent waiting rather than building or testing, the gate is likely the cause. Our post on metrics for high-performance CI/CD explains how to measure where that time goes.
Pitfall 2: approvers who cannot judge the change
A change advisory board or a release manager often sees a ticket title, a short description and a list of linked commits. They cannot read every diff, and they usually do not know the service well enough to spot a subtle problem. DORA's guide makes the same point: distant reviewers may miss the implications of a change, and relying on a central body to catch errors adds delay without adding much detection.
The people best placed to judge a change are the ones who know the code and the system: the author's teammates and the automated tests they wrote. Moving the human check closer to the change, into code review, puts it where it can actually catch problems.
Pitfall 3: rubber stamps and approval fatigue
When someone approves dozens of deployments a week and nearly all of them are fine, approving becomes automatic. Click, next. The gate still exists on paper, and everyone feels covered, but it has stopped checking anything. This is worse than no gate, because it creates false confidence: incident reviews find that "the change was approved" and stop looking for the real gap.
A useful test: look at the last few hundred approvals. How many were rejected, and why? If the answer is "almost none" and the rejections were for trivial reasons, the step is not finding problems.
Pitfall 4: the same gate for every change
A one-line copy change and a database schema migration are not equally risky, but a uniform approval process treats them the same. DORA lists uniform treatment as a common pitfall because it spends reviewers' attention on low-risk changes and leaves less for the dangerous ones. The fix is risk-based routing: low-risk changes flow through automated checks alone, and only changes that touch sensitive areas (payments, authentication, data migrations, infrastructure) get extra scrutiny.
Pitfall 5: inconsistent evidence and weak audit trails
Manual approvals are often justified as an audit control, and they can make audits harder. Approvals given in chat or by email, or a ticket approved by someone who never saw the deployed artifact, leave a trail that does not prove what an auditor actually cares about: that this exact build passed these exact checks and was authorized by someone other than its author.
An automated pipeline can record that evidence by default. It links each deployment to the commit, the pull request review, the test results, the scan reports and the artifact digest. Peer review recorded in the development platform, which DORA recommends for segregation of duties, is stronger evidence than a release manager's click on a ticket.
Pitfall 6: more process after every incident
After an outage, adding another approval layer is the easy response. It is visible and quick to agree on. DORA warns against exactly this: more approval steps increase lead time and batch size, which feeds the cycle in pitfall 1. Its recommendation is to invest in making it quicker and safer to make changes. In practice that means asking, after each incident, "what check would have caught this automatically?" rather than "who should have approved this?"
Pitfall 7: blocked recovery
Gates designed for planned changes often apply to fixes too. When production is broken and the fix is ready, a hotfix that must wait for an approver extends the outage. Teams then work around the process with emergency bypasses, which become the least controlled path to production. If you keep approvals, define in advance how urgent fixes move, and make that path fast and still recorded.
Pitfall 8: blurred ownership and slow feedback
When a change needs someone else's approval before it ships, responsibility quietly moves away from the team that wrote it. Developers start to treat the gate as the safety net ("the release manager will catch it"), and the approver assumes the developers tested properly. Each side relies on the other, and nobody fully owns the outcome.
The delay also weakens feedback. A developer who merged a change on Monday and sees it deployed on Thursday has moved on to other work. If the release then causes a problem, they have to reload context they no longer have, and the connection between their change and its effect is harder to see. Short, automated paths to production keep that loop tight: the person who made the change watches it go live, sees the metrics, and fixes problems while the details are fresh. Teams that own their deployments this way tend to write better tests too, because they are the ones paged when something slips through.
What to use instead
Replacing a manual gate does not mean removing control. It means moving the control to where it works better. The table maps common approval goals to automated or lighter-weight alternatives.
| What the approval is meant to ensure | Better control | Evidence produced |
|---|---|---|
| The code is correct | Required automated tests and peer code review before merge | Test reports, review record on the pull request |
| The change is secure | Dependency, image and secret scanning, SAST and DAST in the pipeline | Scan reports tied to the build |
| The change follows policy | Policy as code checks on infrastructure and Kubernetes manifests | Pass or fail result per policy |
| Nobody ships their own code unchecked | Branch protection with required reviewers other than the author | Reviewer identity and timestamp |
| A bad release is contained | Canary or blue/green rollout with automatic rollback on error metrics | Rollout and rollback events |
| The right people know a change is coming | Automatic notifications and a change log generated by the pipeline | Messages and a searchable change record |
Two of these deserve a closer look. Automated security checks give every change the same scrutiny at the same point; our guide to integrating OWASP ZAP into CI/CD shows one example. And progressive delivery, where a release goes to a small slice of traffic first and rolls back automatically if error rates rise, protects users far better than a human reading a ticket ever could. Our post on readiness gates for deployment approvals covers automated checks that hold a rollout until the system is healthy.
When a human approval still makes sense
Some decisions are not technical. Launching a feature on a specific date for a marketing campaign, starting a migration that will lock a large table, or touching infrastructure that needs a maintenance window all involve trade-offs a test cannot judge. Regulated environments may also require a named person to sign off certain changes. DORA suggests that a change board's role can shift towards coordinating teams and making high-level business trade-off decisions instead of acting as a gatekeeper for every deployment.
If a manual gate stays, design it carefully:
- Limit it to defined high-risk changes, selected by rules (paths changed, services touched, change type) rather than by habit.
- Show the approver evidence: test results, scan summaries, the diff, and the rollout plan, in the same place as the approve button.
- Prevent self-approval. GitHub environments have a "prevent self-review" setting that stops users from approving runs they triggered.
- Set a timeout. A Jenkins
inputstep can sit inside atimeoutblock so a forgotten approval does not hold an executor or block the pipeline forever. - Restrict who can approve. GitHub required reviewers accept up to six people or teams, and only one needs to approve. Jenkins
inputcan be limited with thesubmitterparameter. - Review the gate itself. Track how often it rejects, how long it holds changes, and whether it ever caught a problem. Remove it if the data says it is not working.
Here is what a focused gate looks like in a Jenkins pipeline, limited to a release group and bounded in time:
stage('Approve production') {
when { branch 'main' }
steps {
timeout(time: 2, unit: 'HOURS') {
input message: 'Deploy build to production?',
ok: 'Deploy',
submitter: 'release-managers'
}
}
}
The equivalent in GitHub Actions is a job that targets a production environment configured with required reviewers, prevent self-review, and a deployment branch rule that only allows main. Branch rules matter as much as reviewers, because they stop a deployment from an unreviewed branch even if someone approves it.
Moving away from manual gates step by step
Removing gates in one go rarely works, because people trust them even when the data does not. A gradual approach builds that trust:
- Measure first. Record how long changes wait at each gate and how many are rejected, for a few weeks.
- Strengthen automation. Make sure tests, scans and branch protection are required and reliable before anything else changes.
- Exempt a low-risk category, such as documentation or configuration with automated validation, and compare change fail rate before and after.
- Add progressive delivery with automatic rollback for the services that deploy most often.
- Narrow the remaining gate to rule-based high-risk changes, and document the emergency path.
- Explain the process. DORA notes that simply helping teams understand how the approval process works improves performance. Write it down where engineers will find it.
Track change lead time and change fail rate through the transition. If lead time falls and fail rate holds steady or improves, you have the evidence to keep going. Our article on where approval gates fit in a modern CI/CD workflow describes the target state, and self-healing pipelines covers automated recovery once gates are gone.
Pipeline design, automated quality gates and progressive delivery are part of our DevOps training, taught in the Kharadi, Pune classroom and live online across India.
FAQs
Are manual approvals in CI/CD always bad?
No. They make sense for a few high-risk or business-timed decisions. The problem is using them for every change, where they add delay and batching without catching more defects.
What does DORA research say about change approval boards?
DORA's change approval guide reports that heavyweight external approvals hurt software delivery performance, and that no evidence was found that a more formal external review process reduces change failures.
How can we meet segregation of duties without manual gates?
Require peer review from someone other than the author before merge, enforce it with branch protection, and keep the review record in the development platform. DORA recommends peer review for this goal.
How many reviewers can a GitHub environment require?
You can list up to six people or teams as required reviewers. Only one of them needs to approve for the job to proceed, and you can block people from approving runs they triggered.
How do I stop a Jenkins approval from blocking forever?
Wrap the input step in a timeout block. If nobody responds in time, the stage is aborted instead of waiting indefinitely.
What should replace a manual approval for security?
Automated dependency, image and secret scanning plus static and dynamic testing in the pipeline. They apply the same checks to every change and produce reports auditors can review.
How do we prove to auditors that automated controls work?
Link every deployment to its commit, review, test results, scan reports and artifact digest. A pipeline can record this automatically, which is more complete than a manual sign-off.
What metrics show whether an approval gate is useful?
Time spent waiting at the gate, rejection rate, and the change lead time and change fail rate before and after changes to the gate. A gate that rarely rejects anything while adding days of delay is a candidate for removal.
References
What's Your Reaction?
Like
0
Dislike
0
Love
0
Funny
0
Angry
0
Sad
0
Wow
0